This might sound a bit insane, but could this work?? The idea is to put up fine mesh, do a scratch coat and a 2" stucco layer, then either
(A) fill the form with 3/8" concrete a few feet at a time, or
(B) pour a lightweight styrofoam mix while leaving space to back-pour 3/8" concrete for columns and bond beams.
All reinforced with rebar and proper cure times. I'd like it to pass code, just wondering if this could be a faster way to build or if its a total no-go.
(A) fill the form with 3/8" concrete a few feet at a time, or
(B) pour a lightweight styrofoam mix while leaving space to back-pour 3/8" concrete for columns and bond beams.
All reinforced with rebar and proper cure times. I'd like it to pass code, just wondering if this could be a faster way to build or if its a total no-go.