aggregate3xpertzone
Member
- Joined
- Aug 8, 2025
- Messages
- 7
I'm turning my old 4" concrete pool deck into a covered pergola area. The city inspector has specified that I need to have footings measuring 18"L × 20"W × 14"H for each 8×8 timber post. I'm planning to cut out rectangular sections and dig down to the proper depth, but I'm a bit worried about how the patches will look once everything is done. Has anyone else done a similar deck retrofit?