BREAD&BUTTER
New member
- Joined
- Jun 16, 2025
- Messages
- 2
I poured a 50x140 concrete slab up here in northwest Wisconsin last August. It wasn't covered after pouring, and we actually started using it by November. I was saying that it's a little too short of a time-frame but I was just dismissed LOL. Now the far west 10 feet of the slab is peeling already. The damaged layer seems super thin, like a couple millimeters only. When I poke it, some spots even crumble down deeper like little holes. I don't know if this matters but the saw-cut control joints are still okay. What's the problem? Still fixable?