Tore down an old corn crib and now have two 5x30 slabs with a 12-foot gap between them. I'm planning to fill that gap with a 10x30 slab to make a full 20x30 base for a garage. The old slabs have footings, question... do I need to add footings on the new section and tie it all together with rebar?