• You're one step from joining Concrete Work Forum – Mixing, Formwork & Professional Techniques.
    Create a free account to post, follow threads, and never miss an update.  Sign up free →

Moisture while flooring

you can try a plastic sheet test by taping a plastic sheet to the floor and leaving it for about 24 to 48 hours, if you see condensation or dampness, there's moisture underneath. A moisture meter is another option; it measures the moisture level in the subfloor and helps determine if it's safe for flooring.
 
Back
Top